April 18, 2009 Update

On Saturday, April 18 with just a few volunteers we were able to:

Finish building the shed
Prime paint the finished exterior basement window frames
Install insulation and most greenboard in the bathroom
Finish rebuilding the front porch with last row of blocks
Replaced the damaged sill plate under the front door
Finish mudding and sanding the kitchen walls prior to painting with primer
Removed another basement window and repaired the surrounding cement frame
Tar was painted on appropriate areas of the exterior block wall
Shrubbery was trimmed by deck

Dave Jones came and finished the rough plumbing; he scheduled his inspection for next week

B-Safe Electric passed their rough electrical inspection last week

A great lunch was donated and delivered by Kathy and Tom Pustell, thank you.

Please post or send me pictures if you have them.

Thanks again to all,
Steve Polgar