On Saturday we:
Hand scraped last of exterior paint
Installed shelves in shed
Removed one basement storm window
Trimmed shrubs, cleared twigs and branches
Prepped driveway for June 27 concrete pour
Added new chimney crown
Painted in bathroom, kitchen, closets and hallways
Replaced defective cedar shakes
Power washed the exterior of house
Sanded, painted and installed crawlspace “window”
Added new gutter downspout