On Saturday we were able to:
Finished painting the hallway, kitchen and stairway
Reworked and added new brick molding around back door
Installed new bathroom window
Added cedar shakes around new bathroom window
Installed 2 of 3 tub surround panels in bathroom
Scraped paint off front exterior wall
Framed driveway for concrete paving
Removed and replaced cold air return panels in basement
Added final trim pieces to shed
Thanks to all,
Steve Polgar
No comments:
Post a Comment