August 17, 2009 Update: Catholic House






















On Saturday we accomplished:

Last molding installed in bathroom and painted
Rear door scraping eliminated
Bathroom trim painted
Door to basement utility room hung
Basement walls painted
Heating and return air ducts connected in basement
Stove gas line installed
Bathroom towel bars and toilet paper holder installed
Sliding closet doors painted and hung
Closet doors in bedroom scraping eliminated
Dishwasher rewired to access different plug
Light switch box in attic was raised up about 12”
Attic access panel painted and installed
Deck boards repaired and nailed in place
Rear screen door installed
Deck stained
Thanks again,
Steve