August 8, 2009 Update

On Saturday with a sizable crew we:

Cleaned and reorganized all materials and tools; unneeded items were seperated for removal
Tuck pointed cracks on the interior side of basement block walls
Scraped and painted the interior side of basement block walls
Installed the last of the new basement windows
Added molding in bathroom
Caulked and painted bathroom window frame and tub/tub surround joint
Added anti-tip bracket to floor under stove
Wired the dishwasher
Cut and hung sliding doors for bedroom closet, painted same
Painted plumbing access panel at stair landing
Installed all door stops
Nailed down the last 2 stair tread shoe grips
Installed dryer vent hose
Heat registers cleaned, painted and installed
Installed risers on stairway
Cleaned all windows and frames

Sarah, Grace and Larry brought lunchmeat, bread, chips and drinks for lunch. Thank you.

And thank you all,
Steve Polgar

No comments:

Post a Comment