On Friday, Chuck spent a couple hours laying the remainder of the Pergo flooring.
On Saturday, Aug 1 we:
Cleaned house and rearranged tools
Removed the old gutters
Nailed aluminum sheets to fascia
Installed trim molding
Sanded and painted the attic opening
Attached aluminum shoe grips to stair treads
Installed the refrigerator, stove and dishwasher
Painted one side of rear door
Finished repairing the chimney and flashing
Cleaned basement of debris
Removed last old basement window; built frame for new
Hung front storm door
Touch-up paint throughout
Shaved side and hung bedroom door
Dave the plumber installed all plumbing except the tub/shower devices
Thanks again to all,
Steve Polgar
On Saturday, Aug 1 we:
Cleaned house and rearranged tools
Removed the old gutters
Nailed aluminum sheets to fascia
Installed trim molding
Sanded and painted the attic opening
Attached aluminum shoe grips to stair treads
Installed the refrigerator, stove and dishwasher
Painted one side of rear door
Finished repairing the chimney and flashing
Cleaned basement of debris
Removed last old basement window; built frame for new
Hung front storm door
Touch-up paint throughout
Shaved side and hung bedroom door
Dave the plumber installed all plumbing except the tub/shower devices
Thanks again to all,
Steve Polgar
No comments:
Post a Comment